This is usually because low quality leak prone decking materials such as epdm rubber are used often in an effort to save money.
Q deck roof construction.
The guards shall be included in the height measurement of the building.
Let the epoxy set leaving it overnight will assure that it is rock solid and then add the anchor bolt anchor washer and nut and tighten.
Covered decks can be made with either stand alone roofs or when the deck is adjacent to a building with a roof connected to the building.
The answer in this case though is a common misconception among contractors and engineers.
Building on an existing deck.
Check local building code to see if you can attach a patio roof directly to your deck.
When exceeding this height the most feasible alternative is to consider it an accessory occupancy ibc 2012 505 2 and 508 2.
A stand alone roof could have been constructed but would have looked decidedly odd next to the garage but not a part of it.
Some kind of roof line attached to the garage would be needed.
Adequate drainage system shall be provided for planters and roof deck area and maintained to.
Considering a roof deck as a story may be acceptable when the height of the deck does not exceed 2 3 stories depending on the construction type and whether or not sprinklers are used.
On average 300 sq ft.
The truth is there is no such thing as q deck.
42 high minimum guards shall be provided along the edge of the rooftop deck area in compliance with the los angeles municipal code lamc section 91 1015.
Blow out the dust fill the hole with epoxy and insert the rod to the required depth.